
Installation von stoßdämpfenden Belägen für Spielplätze
FAQ
What surface is best for high fall height playground equipment?
For higher fall zones, poured in place rubber or thick safety tiles are often the best options because they can be built to the required impact rating. We assess equipment height and layout to specify the correct build up. The goal is consistent protection across all key landing areas.
How long does playground safety flooring installation take?
Time depends on area size, base condition, and the system selected. Small zones may be completed in a few days, while larger sites or major base preparation can take longer. We provide a clear schedule before work begins and coordinate around school or facility hours where possible.
Can you install shock absorbing flooring over existing concrete or paving?
In some cases yes, but it depends on drainage, surface condition, and levelness. We inspect for cracks, ponding water, and slopes that could affect adhesion or safety. If needed, we recommend preparation steps to ensure the new surface performs properly.